Commercial & industrial solar · Luzon

Put your roof to work.

Factories, warehouses and cold storage use most of their power in daylight, when solar is producing. We survey your roof and your Meralco bills, then show you exactly what a system would save.

  • Free site assessment, no obligation
  • Engineered proposal in 10 working days
  • Net-metering and permits handled for you

What could solar save you?

₱400,000
When does your site use most power?

0% of your bill

Monthly savings
₱0
System size
0 kWp
Roof area needed
0 m²
Payback
~0 years

A rough guide at ₱10.50/kWh and 3.8 peak sun hours. Your site survey gives the real figure.

Get my exact figure

Recently commissioned

  1. Solar panels covering a cold storage warehouse roof in Calamba

    Cold storage warehouse

    Calamba, Laguna

    System
    412 kWp
    Commissioned
    March 2026
  2. Rooftop array on a garment factory in Marilao

    Garment factory

    Marilao, Bulacan

    System
    286 kWp
    Commissioned
    November 2025
  3. Aerial view of a distribution centre roof with solar panels in Tarlac

    Distribution centre

    Tarlac City

    System
    1.1 MWp
    Commissioned
    July 2025

From survey to switch-on

  1. 01

    Site assessment

    An engineer inspects your roof structure, shading and electrical room, and we review 12 months of bills. About half a day on site.

  2. 02

    Proposal

    A system design with a production estimate, a fixed price and the savings case. Ready within 10 working days.

  3. 03

    Permits and install

    We file the permits and the net-metering application with Meralco. Installation usually takes 4 to 10 weeks, with no shutdown.

  4. 04

    Monitoring

    Production is monitored remotely. Panels are cleaned and checked twice a year for the first five years.

Two ways to pay

Buy the system

You own the system from day one and keep all of the savings. Most of our clients choose this.

Solar lease, no upfront cost

We fund, own and maintain the system. You pay a fixed rate per kWh it produces, set below your grid rate. Contracts run 10 to 15 years.

Book a free site assessment

Tell us about your site. An engineer will call within one working day to arrange a visit.

Prefer to talk? (02) 8655 1840
projects@sinagenergy.ph

Questions we hear a lot

Is my roof strong enough?

Most metal and concrete industrial roofs are. Panels add about 15 kg per square metre. The site assessment includes a structural check, and we tell you if anything needs reinforcing before you commit.

What happens on weekends when the plant is closed?

Under net metering, power you don’t use is exported to the grid and credited on your bill. For sites with long shutdowns we size the system to keep exports low.

How long do the panels last?

Panels carry a 25-year performance warranty and inverters 10 years. We include inverter replacement in the lifetime cost in your proposal.

Do we need to shut down during installation?

No. Roof work happens around your operations. The final connection takes a few hours and is scheduled for a weekend or a planned shutdown.